
Crane Equipment
Crawler Cranes
Lattice-boom crawler cranes from 100 to 600+ tons — the choice for long-duration sites and heavy lattice work.
When the project rewards a crawler
Crawler cranes earn their keep on long-duration jobs and heavy lattice work. Once assembled, they’re cheaper to keep on a site for weeks or months than to demob and remob a wheeled crane. They also pick-and-carry — meaning they walk loads — which AT and RT cranes cannot.
Where we run them
- Wind farm construction — turbine erection, particularly for taller hub heights
- Power generation — turbine and generator installation, transformer placement
- Refinery and chemical-plant turnaround and revamp work
- Modular construction — heavy module sets requiring pick-and-carry
- Bridge and infrastructure — long-boom reach over restricted access
Capacity tiers we operate
| Tier | Capacity | Typical use |
|---|---|---|
| Mid crawler | 100–250 ton | Industrial, infrastructure |
| Heavy crawler | 250–500 ton | Wind, vessel sets, transformers |
| Superheavy crawler | 500+ ton | Largest turbine sets, modules |
Configurations
- Main boom — lattice sections, configurable lengths
- Fixed jib — extended reach beyond main
- Luffing jib — reach plus controllable angle for restricted-radius work
- Heavy-lift attachments — superlift / ringlift systems for largest tier
Mobilization considerations
Plan crawlers early. Mobilization is multi-load:
- Tractor / carrier
- Tracks (often shipped separately)
- Counterweights
- Boom sections
- Jib sections
- Rigging and accessories
Typical mob window is 5–7 days from order to operational on a prepared site, plus assembly time on arrival.
Frequently asked questions
When should I rent a crawler crane instead of an all-terrain?
Crawlers are better when you need: pick-and-carry capability (lifting while moving), long-duration on a single site (days to months), heavy lattice-boom configurations for maximum capacity, or when ground conditions favor tracked travel over tire travel. Crawlers walk under load; ATs cannot.
Can crawler cranes pick and carry?
Yes — that's one of the primary advantages. Crawlers can lift a load and walk it across a prepared surface, which is essential for some wind, power, and modular construction work. ATs and RTs cannot do this safely.
How are crawlers transported?
Crawlers do not travel under their own power on highway. They ship disassembled — tracks separated from the carrier, boom in sections, counterweights as separate loads. Mobilization typically runs 4–10 truckloads.
How long does a crawler take to assemble on site?
Assembly takes 2–5 days depending on size and configuration. Once assembled, a crawler is usually expected to stay on site for the duration of the project.

24/7 Dispatch · Nationwide
Tell us what you need to move.
One call covers the crane, the haul, and the logistics. We’ll spec the crew, the equipment, and the route — and put a written quote in your hands.
Request a Quote 24/7 Dispatch Lines
- Crane & Rigging405-373-2979
- Heavy Haul405-506-1850
- Bulk Logistics405-506-1869