Large Crane Rental (300+ ton)
Heavy lift cranes from 300 to 1,200 tons for vessels, modules, towers, and turbine work.
When the lift outgrows your standard fleet
For 300+ ton work, the planning matters more than the iron. We assemble large-class cranes routinely — but the lift only goes as well as the analysis behind it.
What we plan before the boom comes off the truck:
- Pick weight verification — including rigging, blocks, and any below-the-hook tooling
- Ground bearing analysis — soil conditions, mat sizing, outrigger or crawler pressures
- Boom and jib configuration — main, luffer, fixed-jib, super-lift options
- Counterweight loadout — what’s required vs. what’s available at the yard
- Mobilization route and assembly window — multi-load transport, assembly area, weather contingency
- Multi-crane coordination if tandem or tailing — synchronized load charts, signal-person assignment, lift-director designation
Common large-lift work we do
- Refinery and chemical-plant vessel sets
- Wind turbine nacelle, hub, and rotor sets
- Power-generation transformer and generator placement
- Modular construction lifts
- Tower and stack work
- Heavy module load-outs and roll-ons (paired with SPMTs)
Fleet at this tier
Mobile hydraulic all-terrain cranes through 1,200 tons; crawler cranes through 600+ tons. Configurations include super-lift, luffing jib, and fixed-jib options. See All-Terrain Cranes and Crawler Cranes for fleet detail.
Lift planning included
Lift planning and engineering is in-house — we don’t farm it out. That means faster turn-around, better integration with field crews, and accountability under one roof.
Request a large crane quote › or call 24/7 dispatch: 405-373-2979
Frequently asked questions
When do I need a 300+ ton crane?
Large cranes are typically required for: setting refinery vessels and reactors, erecting wind turbine nacelles and towers (most modern turbines need 600+ ton class), placing modular plant components, lifting transformers and generators, and any pick where the load weight or radius exceeds smaller-class capacity.
Do large crane rentals include the lift plan?
An engineered lift plan is included in the project scope for any pick that meets the criteria for a critical lift or that requires multi-crane coordination. Routine large-crane work without those triggers can run with a documented standard plan.
How long does it take to mobilize a 600-ton crane?
Heavy cranes ship in multiple loads — boom sections, counterweights, the carrier, and rigging arrive separately. Mobilization typically runs 3–7 days depending on origin yard, permits, and assembly location. Long-lead bookings are common for outage and turnaround windows.
What ground conditions does a large crane require?
Outrigger and crawler ground bearing pressures for 300+ ton cranes can exceed 30,000 psf without mats. Most projects require crane mats or engineered timber pads, and an engineered ground-bearing analysis is part of the lift plan.

24/7 Dispatch · Nationwide
Tell us what you need to move.
One call covers the crane, the haul, and the logistics. We’ll spec the crew, the equipment, and the route — and put a written quote in your hands.