Crane Service

Large Crane Rental (300+ ton)

Heavy lift cranes from 300 to 1,200 tons for vessels, modules, towers, and turbine work.

When the lift outgrows your standard fleet

For 300+ ton work, the planning matters more than the iron. We assemble large-class cranes routinely — but the lift only goes as well as the analysis behind it.

What we plan before the boom comes off the truck:

  • Pick weight verification — including rigging, blocks, and any below-the-hook tooling
  • Ground bearing analysis — soil conditions, mat sizing, outrigger or crawler pressures
  • Boom and jib configuration — main, luffer, fixed-jib, super-lift options
  • Counterweight loadout — what’s required vs. what’s available at the yard
  • Mobilization route and assembly window — multi-load transport, assembly area, weather contingency
  • Multi-crane coordination if tandem or tailing — synchronized load charts, signal-person assignment, lift-director designation

Common large-lift work we do

  • Refinery and chemical-plant vessel sets
  • Wind turbine nacelle, hub, and rotor sets
  • Power-generation transformer and generator placement
  • Modular construction lifts
  • Tower and stack work
  • Heavy module load-outs and roll-ons (paired with SPMTs)

Fleet at this tier

Mobile hydraulic all-terrain cranes through 1,200 tons; crawler cranes through 600+ tons. Configurations include super-lift, luffing jib, and fixed-jib options. See All-Terrain Cranes and Crawler Cranes for fleet detail.

Lift planning included

Lift planning and engineering is in-house — we don’t farm it out. That means faster turn-around, better integration with field crews, and accountability under one roof.

Request a large crane quote ›   or call 24/7 dispatch: 405-373-2979

Frequently asked questions

When do I need a 300+ ton crane?

Large cranes are typically required for: setting refinery vessels and reactors, erecting wind turbine nacelles and towers (most modern turbines need 600+ ton class), placing modular plant components, lifting transformers and generators, and any pick where the load weight or radius exceeds smaller-class capacity.

Do large crane rentals include the lift plan?

An engineered lift plan is included in the project scope for any pick that meets the criteria for a critical lift or that requires multi-crane coordination. Routine large-crane work without those triggers can run with a documented standard plan.

How long does it take to mobilize a 600-ton crane?

Heavy cranes ship in multiple loads — boom sections, counterweights, the carrier, and rigging arrive separately. Mobilization typically runs 3–7 days depending on origin yard, permits, and assembly location. Long-lead bookings are common for outage and turnaround windows.

What ground conditions does a large crane require?

Outrigger and crawler ground bearing pressures for 300+ ton cranes can exceed 30,000 psf without mats. Most projects require crane mats or engineered timber pads, and an engineered ground-bearing analysis is part of the lift plan.

24/7 Dispatch · Nationwide

Tell us what you need to move.

One call covers the crane, the haul, and the logistics. We’ll spec the crew, the equipment, and the route — and put a written quote in your hands.

Request a Quote 24/7 Dispatch Lines