455,000 lb Demethanizer Tower, 840 Miles, Production to Pad

One team moved a 455,000 lb, 173 ft tower 840 miles from the fabrication shop to the pad — then stood it up and set it.

The project

Northwest moved a 455,000 lb, 173 ft long demethanizer tower 840 miles from production in Broken Arrow, Oklahoma to the pad in Mentone, Texas — then stood it up and set it in place.

SpecValue
CargoDemethanizer tower, 455,000 lb, 173 ft
RouteBroken Arrow, OK → Mentone, TX (840 mi)
ScopeLoad-out, over-the-road transport, erection, final set

This is the argument for an integrated operator in one project: the same company engineered the route, hauled the tower, and made the tailing lift. No handoffs, no finger-pointing, one dispatch number.