455,000 lb Demethanizer Tower, 840 Miles, Production to Pad
One team moved a 455,000 lb, 173 ft tower 840 miles from the fabrication shop to the pad — then stood it up and set it.
The project
Northwest moved a 455,000 lb, 173 ft long demethanizer tower 840 miles from production in Broken Arrow, Oklahoma to the pad in Mentone, Texas — then stood it up and set it in place.
| Spec | Value |
|---|---|
| Cargo | Demethanizer tower, 455,000 lb, 173 ft |
| Route | Broken Arrow, OK → Mentone, TX (840 mi) |
| Scope | Load-out, over-the-road transport, erection, final set |
This is the argument for an integrated operator in one project: the same company engineered the route, hauled the tower, and made the tailing lift. No handoffs, no finger-pointing, one dispatch number.

24/7 Dispatch · Nationwide
Tell us what you need to move.
One call covers the crane, the haul, and the logistics. We’ll spec the crew, the equipment, and the route — and put a written quote in your hands.
Request a Quote 24/7 Dispatch Lines
- Crane & Rigging405-373-2979
- Heavy Haul405-506-1850
- Bulk Logistics405-506-1869